Work with the constraints of the installed machine.
An upgrade starts with the existing mechanical envelope, controls architecture and available shutdown window. Review the current documentation and identify what must be replaced, retained or revalidated.
- Existing machine survey and drawing review
- Available space, utilities and extraction interfaces
- Control and safety-system changes
- Shutdown planning and recommissioning scope
Plan the return to production.
Define the installation sequence, test parts, rollback decisions and site acceptance responsibilities. The final scope depends on the condition and documentation of the existing equipment.
Prepare for an engineering review.
Share available drawings, material specifications, annual volume or target cycle, product variants and the planned launch window. We use these inputs to define the next review and the scope of representative trials.
Your next machine.
A better welding process.
Bring your drawings, materials and machine concept. Start with an engineering conversation.
Discuss your project