Write criteria before the test
Identify the product requirements, test methods and responsible decision makers. Acceptance should refer to measurable requirements and agreed operating conditions.
Prepare representative conditions
Confirm parts, materials, recipes, loading method and inspection equipment for factory testing. Record deviations and how they will be resolved.
Plan the site handoff
Confirm utilities, machine interfaces, training and documentation before installation. Define the site test scope and the route for closing outstanding actions.